Question1: In a goal-setting workshop, a decision is made to place circulation at the exterior of the office perimeter next to the window wall. Which of the following is an example of integrated decision-making?
Question2: A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?
Question3: Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?
Question4: A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?
Question5: A luxury hotel project is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be applicable?
Question6: A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?
Question7: For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1.Interior Reuse, how are hazardous materials accounted for in the calculation?
Question8: Using the scale of 0 = no view and 5 = maximum view, what is the view factor in the diagram below, as defined in Indoor Environmental Quality Credit, Quality Views?
Question9: What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?
Question10: Which of the following would contribute to the Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses?
Question11: The project architect suggests reducing the area planned for surface parking and replacing it with additional green space. What benefit would this strategy provide to the owner?
Question12: Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?
Question13: Which of the following prerequisites or credits is affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit, Thermal Comfort?
Question14: The use of MERV 13 (F7) air filters is required to obtain what credit?
Question15: The site of a new open-plan office building is located near a highway. The acoustic consultant is investigating the possibility of using sound masking system to cover the noise impact from the busy road. If sound masking is found to be a feasible option, the noise design of the project can have a maximum limit up to
Question16: For a retail LEED Interior Design and Construction project, the products include 25% by cost Cradle to Cradle v3, Gold certified products, and 25% by cost products assessed with the GreenScreen List Translator. Which of the following Materials and Resources and Innovation credits can the project team achieve?
Question17: Discussing the project goals to help identify the credits and options that the team should attempt is an example of
Question18: A project team is pursuing certification for a performing arts center in an urban neighborhood. The project will earn one point from the Location and Transportation Credit, Surrounding Density and Diverse Uses. The project team is considering the Location and Transportation Credit for Reduced Parking Footprint. Which of the following needs to be included in the credit calculation?
Question19: A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant. Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?
Question20: A project team is pursuing certification for a medical clinic with 150 full time employees and 250 peak visitors. The project team is considering the Location and Transportation Credit for Bicycle Facilities.Providing which of the following is a minimum requirement to earn the credit?
Question21: What percentage of occupants require individual control of thermal systems under Indoor Environmental Quality, Thermal Comfort?
Question22: When attempting Regional Priority Credit, Regional Priority what must be provided in the documentation?
Question23: A single tenant occupies an entire building but wishes to renovate and achieve LEED certification on only a portion of the building. This is possible if
Question24: A project team member has prepared a map and an accompanying table as documentation for Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses. The map includes the location of each use, the location of the project, and the main entrance of the building. The table includes the distance to each use, the name of each use, and the category of each use. The team lead reviews the documentation and notes an important missing item. Which of the following s the most important item to add to the documentation?
Question25: A project team chooses to pursue the Integrative Process Credit. Which of the following credits can be affected by early planning? (Choose One Answer only)
Question26: The Commissioning Authority (CxA) must report results, findings and recommendations directly to the
Question27: For Indoor Environmental Quality Credit, Quality Views, which one of the following space types must be included when calculating the percentage with Quality Views?
Question28: For a bicycle network to demonstrate compliance with Location and Transportation Credit, BicycleFacilities, the bicycle network must connect to
Question29: When developing the overall energy strategy of the project, which credit should the client consider to work synergistically with the Energy and Atmosphere Credit, Enhanced Commissioning, on an ongoing basis?
Question30: Which of the following would achieve an exemplary performance credit?
Question31: A mechanical engineer needs to determine the number of carbon dioxide monitors needed for the public area of a hotel. The public area includes the hotel front desk, the hotel lobby, two public restrooms and one corridor.The aim is to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2.Additional Enhanced IAQ Strategies, Part C. Carbon Dioxide Monitoring. The project's LEED AP should recommend a minimum of how many CO2 monitors?
Question32: For Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification, the final Cx report must include the
Question33: Based on the results of a six-hour waste stream study, the team for an Interior Design and Construction Retail project plans to provide dedicated areas for four recyclable waste streams: cardboard, plastic, metal, and paper.The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite, Storage and Collection of Recyclables?
Question34: In the pre-design phase, a plumbing engineer identified that the low-flow fixtures which met the Owner's requirements could achieve total reductions in indoor water usage of 39%. Which strategies should be assessed to meet the Owner's Project Requirements goals of 45% reduction?
Question35: According to the Integrative Process Credit, Integrative Process the discovery phase of site selection for an existing building should identify
Question36: To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?
Question37: If the client has purchased green power that is not Green-e certified, then the project team should
Question38: Which standard reference can be used to find minimum ventilation rates?
Question39: Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
Question40: Which project team members should be present at a goal setting workshop when using an Integrative Process project approach?
Question41: The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will
Question42: Which systems must be commissioned to earn Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?
Question43: A project owner requests that additional outside air be provided to the building occupants in order to improve employee health, welfare, well-being and productivity. However, doing so could make it more difficult to achieve which credit?
Question44: A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most appropriate one to use?
Question45: Best practices recommend that the LEED AP confirm that minimum program requirements have been met